FYP 2 WEEK 12 (16/5/2022- 20/5/2022)
Poster Approval Checking & Final Setup on Project Devices
OBJECTIVES
- To do a final review of the poster before it is printed for the presentation session.
- Do the troubleshoot and gather the measured data on the project devices.
CONTENTS
1. Final checking of the poster banner with Academic Supervisor (ASV).
Before attend the demonstration day at Gemilang Hall on Wednesday 25/5/2022, I went through on final checking with my supervisor, Dr Zaki to get his comments on if there should be additions or improvements. He give comments that the poster was great but need little bit changed in terms of sentence structure and change the position of table or figure labelling.
2. Perform the final setup of the circuit to face the demonstration day
Before facing the demonstration day on Wednesday in the Gemilang hall, all the preparations in terms of hardware need to be done by conducting an final inspection of the hardware or components.
This is because I have to carry all the things by using a car from Banting to Unikl BMI Gombak. I also do the labeling for each name on the components and hardware so that it looked neater and easier to read by other people there.
Fully Circuit Box View Setup
Fully Aquaponic System View Setup
3. Gather all the information on measured parameters on aquaponics systems on week 4.
The work are to collect all the data for this aquaponic system been continued in the 4th week to see the condition response to water quality. The reading of each measured parameters such as dissolve oxygen, pH level and water temperature was taken according to different condition such
as morning, evening and night.
Morning in 4th Week
Evening in 4th Week
Night in 4th Week
Blynk Display from Smartphone
SUMMARY
- Manage to complete the poster project and doing the final preparation on the hardware for the demonstration day.