FYP 2 WEEK 14 (30/5/2022- 3/6/2022)

Image
  Continuous  Thesis Report  Touch Up & Plagiarism Submission Check  OBJECTIVES To be submitted progress report and logbook to Supervisor on week 15 To go through on progress report checking and plagiarism check CONTENTS 1. Touch up the final thesis by following the format guidelines until the end.        To further refine this final report, I follow the format guidelines that have been given such as the spacing, font, table of content, list of figures and list of tables Literature Review   The steps of blnyk dashboard setup    Connection of the Sensors 2. Technical paper check with Supervisor      Before doing the official submission on technical paper on friday 3/6/2022, I went through a final checking process with my supervisor, Dr Zaki to get his comments and opinions on whether there should be additions or improvements. He give comments that the technical paper was okay but need a slightly changed on sentence...

FYP 2 WEEK 13 (23/5/2022- 27/5/2022)

Image
  FYP2 PRESENTATION & DEMONSTRATION DAY OBJECTIVES To attend the final presentation of the project during demonstration day Do all the final setup before attend the final presentation. CONTENTS   1. Presentation and demonstration during the defense proposal day Date: 25 May 2021 (Wednesday) Time: 9:30 AM - 2:30 PM Venue: Gemilang Hall During the day of the presentation, I and other students were placed in the Dewan Gemilang to do a project demonstration session. The assessors that judged on our presentation was Dr Ismail Adam and Madam Faezah.      Both lecturers gave comments and encouragement on the projects I had done. They commented that my project works perfectly as well as benefits to everyone especially the user who want to be a farmer. and produce their own food production systems.    Madam Faezah also gave an idea for further research where maybe the filters which I use to filter the impurities that been produced by the fish, can be replac...

FYP 2 WEEK 12 (16/5/2022- 20/5/2022)

Image
  Poster Approval Checking & Final Setup on Project Devices  OBJECTIVES To do a final review of the poster before it is printed for the presentation session. Do the troubleshoot and gather the measured data on the project devices. CONTENTS 1.  Final checking of the poster banner with Academic Supervisor (ASV). Before attend the demonstration day at Gemilang Hall on Wednesday 25/5/2022, I went through on final checking with my supervisor, Dr Zaki to get his comments on if there should be additions or improvements. He give comments that the poster was great but need little bit changed in terms of sentence structure and change the position of table or figure labelling.    2.  Perform the final setup of the circuit to face the demonstration day Before facing the demonstration day on Wednesday in the Gemilang hall, all the preparations in terms of hardware need to be done by conducting an final inspection of the hardware or components.   ...

FYP 2 WEEK 11 (9/5/2022- 13/5/2022)

Image
  Workshop 5 Technical Paper Preparation  &  Gather Data on Measured Parameter in Aquaponics System OBJECTIVES To prepare the requirement needed in technical paper preparation Continue perform the troubleshoot and gather the measured data on the project devices. CONTENTS 1. Workshop 5 Final Year Project (FYP) Technical Paper Preparation      In week 11, the presentation and defense proposal briefing was conducted on Microsoft Teams that involved the FYP Diploma/FYP1/FYP2/IFYP students and the attendance is compulsory. The briefing was conducted by  Madam Punithavathi .  Date: 11 th  May 2021 Time: 2:30 PM - 4:30 PM Venue: Online Microsoft Teams In this briefing, the Final Year Project (FYP) committees have briefed us about: 1. Preparation Technical Paper and Format of Technical Paper.  2. Discussion Tip & Tricks of Technical Paper     2. Gather all the  information on measured parameters on aquaponics systems on we...

FYP 2 WEEK 10 (2/5/2022- 6/5/2022)

Image
  Continuous Gather Data on Measured Parameter in Aquaponics System & Inspection Work  OBJECTIVES Continue perform the troubleshoot and gather the measured data on the project devices. CONTENTS   1.  Perform the inspection work on the aquaponics facilities The inspection work on the aquaponic system needs to be done from time to time to see if the project is ready to be carried out or needs any maintenance such as leaks or damage to the product. 2. Gather all the  information on measured parameters on aquaponics systems on week 2.   The work are to collect all the data for this aquaponic system been continued in the 2nd week to see the condition response to water  quality. The reading of each measured parameters such as dissolve oxygen, pH level and water temperature was taken according to different condition such as morning, evening and night. Morning in 2nd Week Evening in 2nd Week Night in 2nd Week Blynk Display from Smartphone SUMMARY...