FYP 2 WEEK 9 (25/4/2022- 29/4/2022)

Image
  Begin to Collect Measured Parameter Data & Perform Setup on Project Devices  OBJECTIVES Perform the troubleshoot and gather the variable data on the aquaponics project . CONTENTS   1.  Perform the setup for the aquaponics system. After the work process for the installation of the aquaponic system is successfully  completed, this is the time for the simulation and troubleshoot works to perform the  observation check on the project. Fully running on Aquaponic System   Water Pump Running when below 5 mg/L Water Pump Stop when reach the safe level 2. Gather all the  information on measured parameters on aquaponics systems on week 1.   The work are to collect all the data for this aquaponic system been begin in the 1st week to see the condition response to water  quality. The reading of each measured parameters such as dissolve oxygen, pH level and water temperature was taken according to different condition such as morning, e...

FYP 2 WEEK 8 (18/4/2022- 22/4/2022)

Image
  The Full Setup of Aquaponics Project, Blynk Setup & Workshop 4 OBJECTIVES Continuing the progress work on completing the aquaponic setups. CONTENTS 1. Workshop 4 Final Year Project (FYP)  Preparation Slide Presentation and Documentation      In week 8, the presentation and defense proposal briefing was conducted on Microsoft Teams that involved the FYP Diploma/FYP1/FYP2/IFYP students and the attendance is compulsory. The briefing was conducted by Madam Azliza Mohamad Arshad.  Date: 20 th  April 2022 Time: 2:30 PM - 4:30 PM Venue: Online Microsoft Teams In this briefing, the Final Year Project (FYP) committees have briefed us about: 1. Planning Flow during the Defense Proposal Day.  2.Arrangement of Slide Presentation and Documentation 3. Tips and Tricks of Presentation   2. Continue the work on completing the aquaponics system The work progress are keep going by setting up the blynk application in the  smartphone. In the blynk...

FYP 2 WEEK 7 (4/4/2022- 8/4/2022)

Image
  The Full Setup of Aquaponics Project,  Software Simulation & Workshop 3 OBJECTIVES To gain knowledge about the requirement needed in Chapter 4 (Result & Discussion) & Chapter 5 (Conclusion) from   3 rd  Bri efing. Continuing progress work on the aquaponic setups. CONTENTS 1. Workshop 3 Final Year Project (FYP)  Thesis and Proposal Writing      In week 7 , the general briefing was conducted on Microsoft Teams that involved the FYP Diploma/FYP1/FYP2/IFYP students and the attendance is compulsory. The briefing was conducted by Sir Azmi Hashim.  Date: 6 th  April 2022 Time: 2:30 PM - 4:30 PM Venue: Online Microsoft Teams In this briefing, the Final Year Project (FYP) committees have briefed us about: 1. Results & Discussion (Chapter 4), Conclusion (Chapter 5) 2.  Abstract in Thesis Writing or Summary in Proposal Report 2. Continue the work on completing the aquaponics facilities. The progress work of my aquaponic syste...

FYP 2 WEEK 6 (28/3/2022- 3/4/2022)

Image
  The Full Setup  on Aquaponics Facilities  "The Shelves" & Software Simulation OBJECTIVES Continuing progress work on to produce the aquaponic systems CONTENTS 1. Continue the work on building of aquaponics facilities. After the installation of my aquaponic system, the setup was completely done like fully piping installation and also all the parts were placed according to the planned flow. Solid Waste & Bio Filter Aquarium setup with full piping Piping flow from fish tank to filter and gutter grow beds Front view of my aquaponics setup 2. S oftware simulation code by using the Arduino IDE All programming simulation work is done by using the Arduino Ide software application. This is because I use the NodeMcu ESP32 microcontroller to run the whole system.      Each defined code runs their own function such as the sensor will determined their measured parameters while the relay functionally to control the water pump to ON and OFF mode within a predete...